Operator Analysis Report parameters
Operator is set by the switcher. Switch operators to regenerate the report against a different verified portfolio.
ENGIE Brasil Energia
Four-tier verification rollup
Push 3 (2026-05-31): covers ~11.54 GW of ENGIE's ~13 GW proprietary capacity (88.8%) across 24 mapped complexes. Push 2 mapped 19 entries (~9.25 GW, 71.2%); Push 3 added 5 high-capacity assets — Serra do Assuruá (846 MW wind, BA, verified 100% via named-complex assertion across 24 'Eólica Serra do Assuruá N LTDA' SPVs; ONS uses two name spellings in 2025 — pipeline unions both via ons_name_aliases); Jaguara (424 MW UHE, MG, 100% via JV override — ex-CEMIG acquired by ENGIE in 2017 federal hydro re-tender); Miranda (408 MW UHE, MG, 100% via JV override — same 2017 ex-CEMIG deal); Santo Antônio do Jari (393 MW UHE, AP, 100% via JV override through wholly-owned CEJA SPV); Cachoeira Caldeirão (219 MW UHE, AP, 100% via JV override — acquired Aug 2025 from EDP+CTG in R$ 2.95B deal alongside CEJA). Push 3 also corrected the Assu Sol entry: Push 2 wrongly framed the low generation as substation-slicing; actual cause was ONS renaming the aggregate mid-2025 (Conj. Fotov. Assu Sol 500KV → Conj. Assu Sol). Pipeline now unions both names; 2025 production rose from 35 GWh to ~1,162 GWh (CF still ~15.5% because 12 of 16 parks reached COD only in early 2026). Paracatu pending_verification clamp HELD — Push 3 investigation confirmed the ~158 MW Paracatu excess is COMERC's São João Paracatu I/II UFVs (210 MW outorgada, COD 2023-11-29), NOT ENGIE expansion; clamp prevents over-crediting Comerc's ~352 GWh / ~12 ktCO2 to ENGIE. Per-plant dataQuality distribution: 19 verified / 2 partial (Campo Largo 2 partial-year ramp; Assu Sol still ramping) / 2 estimated (Folha Larga + Sul capacities ONS-peak-derived) / 1 pending_verification (Paracatu, clamped). Remaining ~1.46 GW gap to ENGIE's 13 GW: smaller wind (Trairi 25 MW, Santa Mônica ~97 MW, Pedra do Sal ~18 MW), smaller solar (Cidade Azul ~3 MW, Assu V ~30 MW), Areia Branca SHP ~20 MW, 1 biomass plant, Tubarão P&D + Nova Aurora (below ONS central-dispatch threshold) — long tail of sub-100 MW units. CROSS-OPERATOR FLAG: Jaguara + Miranda are ex-CEMIG; the CEMIG rebuild (notebook 25 when published) MUST exclude both per the cross_operator_exclusions block in operator_mappings.json to prevent double-attribution.
Source: ENGIE Brasil about-page 2025-11-17 + COP30 disclosure (https://www.engie.com/en/about-engie/engie-worldwide/brazil/): ~13 GW PROPRIETARY capacity across ~120 individual plants (unit-level count: every park / UFV / SHP). Karbera reports coverage as % of ENGIE proprietary GW because that is the honest denominator — our cache entries are complex-level rollups, not per-unit. ENGIE's 13.7 GW operational headline in COP30 includes JV-partner shares (Jirau 60% non-ENGIE, Itá 60.5% non-ENGIE, Machadinho 79.52% non-ENGIE, Estreito 59.93% non-ENGIE); proprietary equity-weighted is ~13 GW. Excludes 2 transmission concessions (Gralha Azul, Novo Estado) per Methodology v3.2 transmission rule.
Plant-by-plant breakdown
| Plant | CEG | Tech | MW | Gen (MWh) | Avoided (tCO₂) | Tier |
|---|---|---|---|---|---|---|
| Salto Santiago | UHE.PH.PR.002672-7 | hidroelétrica | 1,420 | 7,387,272 | 264,605 | Grid-verified · ONS hourly dispatch |
| Jirau | UHE.PH.RO.029736-4 | hidroelétrica | 3,750 | 15,874,776 | 187,408 | Grid-verified · ONS hourly dispatch |
| Salto Osório | UHE.PH.PR.002659-0 | hidroelétrica | 1,103.7 | 4,959,892 | 180,059 | Grid-verified · ONS hourly dispatch |
| Conj. Serra do Assuruá | ONS-AGG-serra-do-assuruá | eol | 846 | 2,837,705 | 113,797 | Grid-verified · ONS hourly dispatch |
| Itá | UHE.PH.RS.001152-5 | hidroelétrica | 1,450 | 6,733,260 | 110,740 | Grid-verified · ONS hourly dispatch |
| Jaguara | UHE.PH.SP.001225-4 | hidroelétrica | 424 | 1,860,906 | 69,784 | Grid-verified · ONS hourly dispatch |
| Cana Brava | UHE.PH.GO.000630-0 | hidroelétrica | 450 | 1,839,093 | 68,617 | Grid-verified · ONS hourly dispatch |
| Conj. Campo Largo | ONS-AGG-campo-largo | eol | 326.7 | 1,500,607 | 66,313 | Grid-verified · ONS hourly dispatch |
| Conj. Folha Larga | ONS-AGG-folha-larga | eol | 285 | 1,568,390 | 59,214 | Grid-verified · ONS hourly dispatch |
| Conj. Umburanas | ONS-AGG-umburanas | eol | 360 | 1,550,276 | 58,742 | Grid-verified · ONS hourly dispatch |
| Miranda | UHE.PH.MG.001469-9 | hidroelétrica | 408 | 1,389,032 | 53,330 | Grid-verified · ONS hourly dispatch |
| Santo Antônio do Jari | UHE.PH.AP.026792-9 | hidroelétrica | 392.95 | 1,695,934 | 52,380 | Grid-verified · ONS hourly dispatch |
| Estreito | UHE.PH.MA.028863-2 | hidroelétrica | 1,087 | 3,731,463 | 47,278 | Grid-verified · ONS hourly dispatch |
| Conj. Santo Agostinho | ONS-AGG-santo-agostinho | eol | 437 | 1,223,932 | 46,310 | Grid-verified · ONS hourly dispatch |
| Machadinho | UHE.PH.SC.001356-0 | hidroelétrica | 1,140 | 4,932,163 | 42,869 | Grid-verified · ONS hourly dispatch |
| Conj. Fotov. Assu Sol 500KV | ONS-AGG-fotov.-assu-sol-500kv | ufv | 752.7 | 1,023,597 | 40,013 | Grid-verified · ONS hourly dispatch |
| São Salvador | UHE.PH.TO.028567-6 | hidroelétrica | 243.2 | 1,054,955 | 38,452 | Grid-verified · ONS hourly dispatch |
| Passo Fundo | UHE.PH.RS.002001-0 | hidroelétrica | 226 | 1,022,015 | 37,816 | Grid-verified · ONS hourly dispatch |
| Ponte de Pedra | UHE.PH.MT.002103-2 | hidroelétrica | 176.1 | 1,043,181 | 35,005 | Grid-verified · ONS hourly dispatch |
| Cachoeira Caldeirão | UHE.PH.AP.031186-3 | hidroelétrica | 219 | 849,043 | 26,009 | Grid-verified · ONS hourly dispatch |
| Conj. Folha Larga Sul | ONS-AGG-folha-larga-sul | eol | 150 | 642,448 | 24,358 | Grid-verified · ONS hourly dispatch |
| Conj. Paracatu | ONS-AGG-paracatu | ufv | 132 | 289,080 | 9,728 | Grid-verified · ONS hourly dispatch |
| Conj. Floresta | ONS-AGG-floresta | ufv | 86 | 144,212 | 5,082 | Grid-verified · ONS hourly dispatch |
| Conj. Campo Largo 2 | ONS-AGG-campo-largo-2 | eol | 361.2 | 265,812 | 4,909 | Grid-verified · ONS hourly dispatch |