HIDROELÉTRICA
Nova Ponte
Nova Ponte · MG·510 MW·since 1994
VerifiedGrid-verified · ONS hourly dispatchOperator: CEMIG Geração e TransmissãoLast verified: 31/05/2026 12:19 BRT
Methodology · CRIOS-v3.2-grid-verified
CEG · UHE.PH.MG.001574-1
Verified CO₂ (annual)
Plant total (gross)71,669tCO₂e/yr
Operator beneficial-ownership share100%
Credited to operator (net)71,669tCO₂e/yr
Methodology v3.2 credits each operator its beneficial-ownership fraction of jointly-held assets. Wholly-owned plants show share = 100% with gross = net.
Capacity
510MW
Full-plant generation (annual)
1,823,206MWh
Methodology
CRIOS-v3.2-grid-verified
hourly AEF
Per-plant time series coming next sprint
Hourly intervals, monthly history, and reconciliation rows for individual plants are pending the next v3a cache regeneration. The operator-level rollup above is verified; per-plant drilldowns shipped in the prior version were generated from a deterministic seed and have been removed to avoid presenting illustrative data as measured intervals.Methodology applied
CRIOS-v3.2-grid-verified · hourly AEF · Brazil/SIN
Last verified 31/05/2026 12:19 BRT
Avoided emissions computed at hourly resolution using ONS-verified thermal dispatch and IPCC AR6 fuel emission factors. Operator-level totals roll up across all verified plants in the portfolio.