HIDROELÉTRICA
Theodomiro Carneiro Santiago (Antiga Emborcação)
Araguari / Catalão · MG·1,192 MW·since 1982
VerifiedGrid-verified · ONS hourly dispatchOperator: CEMIG Geração e TransmissãoLast verified: 21/05/2026 12:06 BRT
Methodology · CRIOS-v3.2-grid-verified
CEG · UHE.PH.MG.027115-2
Capacity
1,192MW
Verified CO₂ (annual)
105,518tCO₂e
Generation (annual)
2,644,420MWh
Methodology
CRIOS-v3.2-grid-verifiedhourly AEF
Per-plant time series coming next sprint
Hourly intervals, monthly history, and reconciliation rows for individual plants are pending the next v3a cache regeneration. The operator-level rollup above is verified; per-plant drilldowns shipped in the prior version were generated from a deterministic seed and have been removed to avoid presenting illustrative data as measured intervals.Methodology applied
CRIOS-v3.2-grid-verified · hourly AEF · Brazil/SIN
Last verified 21/05/2026 12:06 BRT
Avoided emissions computed at hourly resolution using ONS-verified thermal dispatch and IPCC AR6 fuel emission factors. Operator-level totals roll up across all verified plants in the portfolio.