MMGD-distributed

CEMIG SIM

Belo Horizonte, MG · Brasil·State-owned·Modern distributed (2018+)
CNPJ · (per-SPV — CEMIG SIM brand = formal legal entity 'CEMIG Soluções Inteligentes em Energia S.A.', CNPJ root 04881791. Five additional consortium CNPJ roots carry CONSORCIO CEMIG SIM GD I/II/III: 45955360, 45955621, 45955633, plus sub-branches 27652877 + 15067610.)
Last verified: 29/07/2026 13:35 BRT
Tier 2 · third-party data with consent
Methodology CRIOS-v3.3-modeled
Net avoided emissions — credited at ownership share
104,065tCO₂ / year
Coverage
60.8% of the publicly disclosed portfolio
Basis
MCTI Combined Margin 0.3271 tCO₂/MWh applied to verified generation

Data completeness · Substantial coverage

60.8% coverage
200.7 of 330 MWp DC matched(~160.6 of ~264 MW AC equivalent)
181 installations matched
Source: pv-magazine Brasil 2025-07-03 (CEMIG SIM disclosure): 'capacidade instalada de 330 MWp em mais de 60 municípios mineiros'. Operational present-tense; explicitly distinguished from the 1 GWp by 2029 target. CEMIG SIM is by structural design DG-only. See notebook 22 §2.
Recent commissionings or untracked subsidiaries
Path to full coverage: Phase 4: RFB ingestion

Value at stake (indicative)

Verified avoided tCO₂/yr translated to USD. Headline anchor is the Brazilian voluntary market — the realistic near-term transactable price. International voluntary tier shown alongside; compliance markets shown for context only (not currently accessible to Brazilian renewable credits).

Primary anchor · Brazilian voluntary market
Realistic near-term transactable price for Brazilian RE credits.
ScopeI-REC BRRange
Verified portfolio
CEMIG SIM · annualized.
104,065 tCO₂/yr
$468k$728k$468k$728k
/ yr
International voluntary · upside potential
Quality-tier dependent. Karbera credits do not carry Verra/Gold Standard registry conformance; pricing toward the lower end pending standard adoption.
ScopeVerraGold StandardRange
Verified portfolio
CEMIG SIM · annualized.
104,065 tCO₂/yr
$468k$833k$520k$1.2M$468k$1.2M
/ yr
Reference benchmarks · compliance markets (context only)
Not currently accessible to Brazilian renewable credits. Shown so the order-of-magnitude is transparent — not in the headline.
ScopeRGGIEU ETS
Verified portfolio
CEMIG SIM · annualized.
104,065 tCO₂/yr
$2.3M$3.6M$7.9M$11M
Future · price discovery pending
SBCE phasing in 2025-2031; obligated-sector trading not yet active.
ScopeSBCE
Verified portfolio
CEMIG SIM · annualized.
104,065 tCO₂/yr
TBD — phasing in 2025-2031

Indicative values across reference carbon markets (USD/tCO₂, sourced per entry below). Not a price quote and not investment advice. Realized prices depend on vintage, registry, project type, additionality assessment, and counterparty. Markets shown are not interchangeable. EU ETS spot is sourced from Trading Economics as a reference redisplay of ICE EUA settlement; canonical reconciliation against DEHST quarterly auction reports is recorded in the EU ETS entry's canonical_reconciliation block.

Indicative value

This quantity of avoided CO₂, priced at published market ranges:

Voluntary market (addressable today)
US$ 468k–1.2MR$ 2.4M–6.4M· PTAX 5.12 · 2026-07-29

Band US$ 4.5012.00/tCO₂ · Verra VCS RE · Gold Standard RE · Brazilian voluntary I-REC · 2026-Q1. FX: Banco Central do Brasil — PTAX (Olinda API, CotacaoDolarPeriodo).

Upside pathway · SBCE compliance market (Lei 15.042/2024, phasing 2025–2031)

No established price exists yet — price forms when the market opens. Regulated-market prices globally run above voluntary prices (see Markets). Karbera shows no number here rather than borrowing one from a market this credit cannot access.

Indicative value of this quantity of avoided CO₂ at published market ranges — not a quote, not an offer, not a valuation of this asset or a return projection. Realized value requires verification, minting, and a buyer. CRIOS tokens are not offered for sale; none are minted.

Verified CO₂ (annual)
104,065tCO₂e
Installations matched
181UCs
Capacity (matched)
200.7MWp DC
~160.6 MW AC equivalent
Dominant tier
ModeledCRIOS-v3.3-modeled

Installations(181/181)

InstallationLocationCapacityProduction (MWh/yr)Loss gross-upAttributionTiertCO₂/yr
GD.MG.000.452.857
CONSORCIO CEMIG SIM GD I
Francisco Sá · MG
CEMIG DISTRIBUICAO S.A
5,000 kWp DC7,446×1.09963inferredModeled2678.2
GD.MG.000.452.863
CONSORCIO CEMIG SIM GD I
Francisco Sá · MG
CEMIG DISTRIBUICAO S.A
5,000 kWp DC7,446×1.09963inferredModeled2678.2
GD.MG.000.452.868
CONSORCIO CEMIG SIM GD I
Francisco Sá · MG
CEMIG DISTRIBUICAO S.A
5,000 kWp DC7,446×1.09963inferredModeled2678.2
GD.MG.002.386.910
CONSORCIO CEMIG SIM GD I
Espinosa · MG
CEMIG DISTRIBUICAO S.A
5,000 kWp DC7,446×1.09963inferredModeled2678.2
GD.MG.002.887.034
CONSORCIO CEMIG SIM GD I
Piumhi · MG
CEMIG DISTRIBUICAO S.A
5,000 kWp DC7,446×1.09963inferredModeled2678.2
GD.MG.001.172.467
CONSORCIO CEMIG SIM GD II
Sacramento · MG
CEMIG DISTRIBUICAO S.A
4,989.6 kWp DC7,431×1.09963inferredModeled2672.7
GD.MG.001.145.938
CONSORCIO CEMIG SIM GD II
Prudente de Morais · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.001.145.941
CONSORCIO CEMIG SIM GD II
Prudente de Morais · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.164.700
CONSORCIO CEMIG SIM GD I
São Romão · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.167.689
CONSORCIO CEMIG SIM GD II
Alto Jequitibá · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.291.203
CONSORCIO CEMIG SIM GD II
Alto Jequitibá · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.325.654
CONSORCIO CEMIG SIM GD I
Montes Claros · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.348.017
CONSORCIO CEMIG SIM GD II
Alto Jequitibá · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.607.955
CONSORCIO CEMIG SIM GD II
Alto Jequitibá · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.002.772.796
CONSORCIO CEMIG SIM GD I
São Sebastião do Oeste · MG
CEMIG DISTRIBUICAO S.A
2,500 kWp DC3,723×1.09963inferredModeled1339.1
GD.MG.000.460.115
CONSORCIO CEMIG SIM GD I
Montes Claros · MG
CEMIG DISTRIBUICAO S.A
2,484 kWp DC3,699×1.09963inferredModeled1330.6
GD.MG.000.976.633
CONSORCIO CEMIG SIM GD II
Riachinho · MG
CEMIG DISTRIBUICAO S.A
2,460 kWp DC3,663×1.09963inferredModeled1317.7
GD.MG.000.527.654
CONSORCIO CEMIG SIM GD II
Lavras · MG
CEMIG DISTRIBUICAO S.A
2,450 kWp DC3,649×1.09963inferredModeled1312.3
GD.MG.000.563.156
CONSORCIO CEMIG SIM GD II
Lavras · MG
CEMIG DISTRIBUICAO S.A
2,450 kWp DC3,649×1.09963inferredModeled1312.3
GD.MG.000.661.504
CONSORCIO CEMIG SIM GD II
Lavras · MG
CEMIG DISTRIBUICAO S.A
2,450 kWp DC3,649×1.09963inferredModeled1312.3
GD.MG.002.173.244
CONSORCIO CEMIG SIM GD II
Lavras · MG
CEMIG DISTRIBUICAO S.A
2,450 kWp DC3,649×1.09963inferredModeled1312.3
GD.MG.002.210.625
CONSORCIO CEMIG SIM GD I
São Romão · MG
CEMIG DISTRIBUICAO S.A
2,250 kWp DC3,351×1.09963inferredModeled1205.2
GD.MG.002.863.423
CONSORCIO CEMIG SIM GD I
Jequitinhonha · MG
CEMIG DISTRIBUICAO S.A
2,000 kWp DC2,978×1.09963inferredModeled1071.3
GD.MG.003.440.708
CONSORCIO CEMIG SIM GD I
Brasilândia de Minas · MG
CEMIG DISTRIBUICAO S.A
1,500 kWp DC2,234×1.09963inferredModeled803.5
GD.MG.002.594.481
CONSORCIO CEMIG SIM GD I
Baependi · MG
CEMIG DISTRIBUICAO S.A
1,050 kWp DC1,564×1.09963inferredModeled562.4
Distributed loss gross-up. Energy injected at the distribution grid displaces generation upstream of network losses, so credited MWh are grossed up by 1/(1 − L). L is the distributor's measured technical loss from ANEEL SAMP — Balanço, PRORET Submódulo 2.6 (resource 9f03a034-fb01-4daa-b6a6-e25a84d979ed), latest 12 published competências per distributor. Production on this table is modeled, not metered.
Page 1 of 8
Ownership netting

Distributed installations are credited to the registry titleholder in full — there is no joint-venture apportionment on this portfolio. No tonne is credited to more than one party.

Provenance

Every figure on this page is derived from public records only. The operator is never the data originator (No-Self-Reporting Principle).

  • Generation · Sistema GD registry capacity with regional capacity factors — modeled, not metered.
  • Registry · ANEEL Sistema GD — installation codes, titleholder, distributor, capacity.
  • Emission factor · MCTI Combined Margin 0.3271 tCO₂/MWh (0.75 × OM 0.4125 + 0.25 × BM 0.0711).
  • Loss gross-up · ANEEL SAMP — Balanço, PRORET Submódulo 2.6 (resource 9f03a034-fb01-4daa-b6a6-e25a84d979ed), measured technical-loss variant per distributor.
  • Pipeline run · cemig-sim-2026-05-03-v3a · 29/07/2026 13:35 BRT
sistemaGd: 2026-04-28 (daily; full-file probe of 2,744,001 installations)onsHourlyGeneration: geracao-usina-2 monthly parquets, 2025-01..2025-12onsThermalDispatch: geracao-termica-despacho-2 monthly parquets, 2025-01..2025-12epePdgd: Power BI dashboard — manual fixture export (none present at time of generation; runs were tier_0_modeled)
Methodology integrity rule

Any displayed numeric figure that an external party could independently verify uses the recognizable form (operator's published nameplate, not internal methodological transformations). Derived values are shown alongside, not in place of, canonical values.

Production-of-record principle

Every per-row numeric figure is traceable to its verification mechanism, and that mechanism is visible to the user via the tier chip.

This is the public listing. Operators with a workspace can access full hourly reconciliation, audit ledger, and CRIOS minting at /app.